Sozopol Seaview Canopy

Project: Sozopol Seaview Canopy

Client: Private

Location: Sozopol, Bulgaria

Challenge: To create a maximum span canopy for the Cliffe House, ensuring unobstructed views with an 11-metre span between columns, all while minimising disruption to a completed house and garden.

Solution: A custom-designed steel canopy utilising a 90 mm gauge steel frame for columns and Omega truss profiles for the trusses. This engineered solution achieved the desired 11-metre span, providing a seamless and expansive outdoor space without compromising the existing landscaping or views.

Construction Duration: 3 Days

Key Features:

  • Maximum Span: 11 metres between columns for uninterrupted views.
  • Minimal Disruption: Rapid 3-day construction, designed to preserve a finished garden.
  • Engineered Steel Frame: Durable and efficient 90 mm gauge steel columns.
  • Omega Truss System: Lightweight yet strong trusses for optimal support.

Want to learn more about our innovative truss systems? Visit our blog page.